NSECH - Cramlington

System: Outsulation
Finish: PMRB
Texture: Sandpebble Fine
Sector: Healthcare

Built by Lend Lease the new Northumbria Specialist Emergency Care Hospital (NSECH) near Cramlington is the first of an innovative new model of emergency care facilities to be built throughout the UK. This new concept of hospital care has a clear outset goal - saving more lives and improving clinical outcomes for patients.

Dryvit worked closely with the Architect and the Design Team from Lend Lease to ensure the most suitable system specification was found that could meet the stringent requirements set out by both building control and the NHS, such as fire performance, whilst delivering the highest levels of aesthetic finish on such a large and challenging project. From the outset the Project Team required a system that could achieve a strong thermal performance to meet the projects goal of 0.19 W/m2k whilst providing a high quality finished white and blue smooth render that could achieve the complex design intent of the scheme. 19,000 m2 of Dryvit's Outsulation external wall insulation (EWI) system was installed directly onto a lightweight steel frame and sheathing board substrate. Completed: 2014.

Dryvit's market leading fire certification

Case history